Recent Reno – Post 3 of 6

On the third day, “monkey paw” as well as many other aches and pains started setting in. I’m sure the first thing that’s coming to your mind is… what is “monkey paw”? Well, monkey paw is the term we use for the hand cramping that occurs for those of us who are more or less desk jockey’s at work and then spend 24 of the previous 48 hours doing home improvements. I’m no doctor but logic would suggest it comes from using muscles that are not regularly used to grip items such as hammers, crow bars, sanders, and paint brushes  to an extreme. Unfortunately until you work to the point of numbness, it can be quite painful (oh yes, this is how we roll). This was our physical condition when we started off day three.  Not to mention this was the day that the mess started really getting to me. There was debris all over the floor despite constant cleaning and everything was everywhere and there was nowhere to put anything (I’m an everything in its place kind of gal so, this really bugs me). Here you can see in this picture of Elsie all of the little wall pieces and random things placed all over the floor. Please keep in mind this was only a snap shot of a 5 ft by 5 ft area, and the whole house was in this condition.

When considering all the aches, pains, anxiety, and an analysis of progress made in comparison to time remaining to work/recoup, we decided it was best to nix the bathroom remodel. The good news is that we did some major shopping and learned a lot about what’s available and in style for bathrooms these days, so we did make some progress just not anything physical. Oh well, we’ll just wait until after the spring semester (guess I’m stuck with Christmas trees a little longer than I planned).

Day three began with a trip to the “Gucci Dump”, which is an awesome landfill because you drive up to a cement barrier and throw things over the side. There are no seagulls, no stepping in garbage, and there is minimal mud.  This was followed by stops at Home Depot and Lowes to get all of the paint (did I mention that we live 10 minutes away from everything? – Awesome!). We bought 5 gallons of Valspar Signature Paint Foggy Mirror, 2 Gallons of Behr Premium Plus Basketry, and lastly one gallon of Olympic Premium Paint Sand-dollar. Also,  re-enforcements (my Mom and Dad) arrived to help for the day shortly after we got home from shopping – WOOO!

We decided not to remove the carpet until after painting, and it served wonderfully as a drop cloth. The rooms really started to transform on this day.  Applying the color to the walls made a huge difference. My Dad and I took on trimming the foggy mirror gray.

My mom was assigned to the basketry tan color for the two bedrooms.

And last but not least, Max spent the first 8 hours of the day replacing electrical sockets and light switches because they were either a) painted over and unusable or b) a hodge podge of various colors. He also installed a ceiling fan in the previously yellow spare bedroom.

During this day of painting, I managed to paint every color and all three brands (Olympic, Valspar, and Behr) of premium paints on the wall. The first lesson I learned is that when your walls are in as crappy a condition as ours were, it is WAY worth it to spring the extra dough for the premium paint as it shows better coverage than non-premium (which was the ceiling paint from the previous day). Also in my unprofessional opinion, the Valspar Signature color had better coverage .  The Behr and Olympic were comparable, but not as good as the Valspar (sorry Behr and Olympic!). Next, we all discovered the accuracy of trim lines when using Frogs Painting tape over the standard blue paint tape or hand painting.  In most cases, I went back and touched up after removal of the Frog’s tape, but it helped expedite the process tremendously. Lastly, my Dad taught me a little trick to keep my trimming brush fresh. I learned that if I rinse out the brush periodically and dry it off with a towel after rinsing that it made little to no effect on the paint and it was easier to clean the paint brush when I finished.

Here was the progress at the end of day three:

Spare Bedroom – Behr Basketry (don’t mind the bed and check out the new ceiling fan!)

LR/DR – Valspar Foggy Mirror

Tricky Part of the Hallway shown only with the trim painted here (this was where I displayed my amazing balancing act!) – Valspar Foggy Mirror

Family Room – Valspar Foggy Mirror

Family Room (painted paneling) – Olympic Sand dollar

Oh, and did I mention I spent a lot of time in the sink last week? Yikes, here I am again!

We painted ALL day, and we finished all of the color painting – BOOM! I’m still learning to remember to get pictures of every room, so only the rooms I remembered to photograph were shown here (Oops!). It was awesome and celebrated by some serious sleep to prepare for the day’s next carpet removal and molding efforts.

One thought on “Recent Reno – Post 3 of 6

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s